https://www.miningweekly.com
Energy|Projects|Environmental|Bearing|Operations
Energy|Projects|Environmental|Bearing|Operations
energy|projects|environmental|bearing|operations

Rosita CPP to resume uranium production this month

7th November 2023

By: Creamer Media Reporter

     

Font size: - +

NYSE America- and TSX-V-listed enCore Energy is gearing up to resume uranium production at the Rosita central processing plant (CPP) before month-end, the company confirmed on Monday.

This comes as the Texas Commission on Environmental Quality (TCEQ) approved the radioactive materials licence for the combined South Texas in-situ recovery uranium CPP plants at Rosita, Kingsville Dome and Vasquez uranium projects.

"We are pleased at the expeditious review by TCEQ, given the complexity of the application including updating the licence, following a multi-decade timely renewal period,” commented CEO Paul Goranson.

Initial production will come from the Rosita extension, Production Area 5, using a newly constructed remote ion exchange unit located at the wellfield. The uranium-bearing ion exchange (IX) resin will be processed into yellowcake uranium produced at the Rosita CPP marking the first new uranium production in Texas in over a decade.

The ten-year licence renewal updates the existing licence to conform to new regulatory requirements and current conditions, and it provides enCore with the ability to incorporate additional remote IX operations, such as the 100%-owned Upper Spring Creek and Butler Ranch Projects as amendments to the renewed licence.

Edited by Creamer Media Reporter

Comments

Showroom

Aqs image
AQS Liquid Transfer

AxFlow AQS Liquid Transfer (Pty) Ltd is an Importer and Distributor of Pumps in Southern Africa

VISIT SHOWROOM 
ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 31 May 2024
Magazine round up | 31 May 2024
31st May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.171 0.206s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: